Public Works Department
Submission of Site Plan before submission of construction plan of the building along with the relevant authenticated documents. These include the construction of multi storied building. The required fees for sanction of the plan should be deposited with the plan. In case of multi storied building plan and affidavit should be submitted.
- Construction of road viz bitumen mastic asphalt and pitch, Pakka drainage and sewerage system within the periphery of this Municipality.
- Issuance of license for hording at the different places within the Municipal area.
- Electricity: looking after the installation of high mast light, supply of lamp (including vapor and LED) for all the light post within the Municipal area.